Steel Warehouse Buildings

As long as you have the right tools and correct guidelines, building a steel warehouse building can be easy.  Warehouse designs are more advanced and available as they were not in the past.  A good manufacture will provide features that will make your planning and constructing process easy.

There are a few factors that will influence the design of your steel warehouse building.  Below, you will find a few key factors that you must consider before  constructing. The first one is building code, you must make sure that you know your local code information. You can find this out by calling your local building department and telling them that you would like to build a metal building at the given location. It is up to you, as the customer, to give the metal building supplier the final code information. It’s also a good idea to look into the setbacks and other code information that may prohibit the use of a metal building or any building on a given lot.

The second factor is the building dimensions of the building. Gather the dimensions of your warehouse building and indicate where you would like to have doors and windows and what color walls, roof and trim you want to have as well as the height of the building. This is extremely important when constructing a warehouse building, as doors must be the right size for large machinery and the dimensions will determine what inevitably can fit inside your warehouse. When it comes to the height of your building, please don’t forget to consider these two factors which are the overall height measured on the outside and the interior clearance.

Roof pitch – The dimensions of your roof are important to consider when constructing your  building.  Take a look at both the shape and the pitch of the roof as rigid frame metal buildings can come with several types of roofing options. Here are some options of roofs: a single slope roof construction starts with one side wall higher than the other and the roof simply slants from the high wall to the lower. A peaked or gable roof is more of a traditional peak with the roof running down both sides.

There are a few more things to consider, once the design of your building is complete. The first thing is engineering.  Once the basic design is complete and you’ve paid a deposit, an engineer needs to create the specifications and blueprints for the building. The next step is fabrication and delivery- This is when the production begins. The beams, posts, girders, side and roof panels, and even the fasteners to hold the building together are all produced at a factory, then shipped to your construction site. Next, site work – this is when the building site can be readied and foundations are poured. Now the last step!  It’s time to build.  When the components arrive and foundation is ready, construction can take place. This can be done by you, or you can hire an erector to put up your steel building. When finishing up your building, this will require insulation, interior walls, exterior finishes, doors and windows.  Finally, when all is complete and your building is up and running, you must have a building inspector approve your steel warehouse building.

For more information on constructing a steel building, please visit us at http://www.norsteel.com

Source: http://www.buildingsguide.com

 

Advertisements

0 Responses to “Steel Warehouse Buildings”



  1. Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s





%d bloggers like this: